More than the visible surface matters
An old tiled floor looks solid, and a thin new covering appears easy to lay over it. Whether this is suitable cannot be established from a photo or the term “click vinyl”. The actual floor construction, selected product and professional assessment on site are what matter. This guide helps you prepare an enquiry; it is not an installation manual.
HandMen refers enquiries in Germany to independent partner contractors within confirmed service areas. The appointed contractor assesses the substrate and installs the floor. A referral does not replace technical approval.
1. Describe the existing floor and label assumptions
Record the rooms, approximate areas and known details of the existing floor. Is underfloor heating, previous moisture damage or visible cracking known? Show an overview and details of the safely accessible surface. State explicitly when the age, adhesive or layers beneath the tiles are unknown.
Do not open, sand or remove unknown old layers merely to obtain a better enquiry photo. Materials must be identified before intervention. Ask who will arrange a suitable investigation if there is cause for concern. A photo also cannot reliably establish whether every tile is adequately fixed.
2. Specify the product together with its underlay
Collect the manufacturer, collection, product code and current installation instructions for the desired covering. It also matters whether an underlay is integrated or planned as a separate layer. Adding another layer is not automatically an improvement.
Quick-Step’s English-language substrate information addresses stability, flatness and treatment of joints, among other points. These product-specific statements do not approve every click vinyl floor over every tiled surface. Ask the contractor to match the applicable documents to the proposed construction.
The comparison of click and glue-down vinyl helps with the basic system choice. The decision to retain the old floor should follow an assessment of its condition, rather than being based only on an attractive material price.
3. Treat joints, damage and height separately
Ask for three distinct findings after the inspection: Which parts of the existing floor are suitable? What preparation is needed? Which questions remain open? Simply stating “prepare substrate” is too vague for comparing quotes.
The finished height affects more than the room itself. Describe doors, transitions to neighbouring rooms, skirting and fitted furniture. Also have it checked whether appliances beneath a worktop can subsequently be removed. The agreement should specify who adapts junctions and which tasks are expressly excluded.
A planning table could contain these entries:
This is a fictional example, not a technical assessment of those components.
- Hallway: joints and visible crack recorded; assessment and preparation unresolved.
- Kitchen door: available clearance not yet measured; identify the responsible contractor.
- Transition to living room: explain the desired level; obtain a separate price for the profile and adaptation.
4. Compare two quotes on the same scope
Do not compare only the covering’s price per square metre. Ask for assessment, preparation, complete build-up, junctions, material supply and disposal to be itemised where relevant. If the work is not yet fully known, it should be clear which assumption supports the price and when an additional task must first be approved.
A useful question is: “What happens if the assessment shows that some areas are unsuitable for the proposed construction?” The answer should explain responsibility and the next decision, rather than simply announce unspecified extra costs. Scheduling and material ordering must fit that sequence.
5. Begin with a clear assessment request
For the initial enquiry, provide rooms, areas, safe photographs, product preference and known limitations. Add: “We would like to retain the existing tiled floor if possible; its suitability has not yet been assessed.” This prevents a preference from being mistaken for a confirmed condition.
The substrate assessment checklist helps record open questions during the discussion. Order materials and installation to suit the agreed construction. The quote, contract and execution are the responsibility of the independent partner contractor, not HandMen.



